【24h】

The application of high strain dynamic pile testing to screwed steel piles

机译:高应变动力桩试验在螺纹钢桩中的应用

获取原文
获取原文并翻译 | 示例

摘要

Screwed steel piles have been in commercial use in Australia for about 3 years and are becoming a popular foundation support for small to medium commercial structures. Although new to Australia this type of pile is described in the old British Foundations code CP4 -1954. In Australia they would previously have been described as micro-piles as they were used for small loadings only but they are now becoming used for more regular pile applications, with serviceability loads increasing to well over 1000kN. They comprise a relatively small diameter steel tube with one or more relatively large diameter screw flights near the toe and sometimes at intervals along the shaft. The structural and geotechnical design of these piles is still evolving. This paper will describe several projects where dynamic pile testing has been successfully used to demonstrate the capacity of these piles with a range of sizes, lengths and ground conditions. In one case a static load test was conducted after the dynamic test and provided a close correlation with the dynamic test result in a Grade A prediction. The general methodology used to conduct the successful tests with the PDA/CAPWAP system will be described.
机译:螺纹钢桩在澳大利亚已投入商业使用约3年,并已成为中小型商业结构的流行基础支撑。尽管这对澳大利亚来说是新的,但旧的英国基金会代码CP4 -1954中描述了这种类型的桩。在澳大利亚,它们以前被称为微型桩,因为它们仅用于小载荷,但现在正用于更常规的桩应用,可使用载荷增加到远超过1000kN。它们包括直径相对较小的钢管,该钢管在脚趾附近有时沿杆身具有一个或多个相对较大直径的螺纹。这些桩的结构和岩土设计仍在不断发展。本文将描述几个成功进行动态桩测试的项目,以证明这些桩在各种尺寸,长度和地面条件下的承载能力。在一种情况下,动态测试后进行了静态负载测试,并在A级预测中与动态测试结果紧密相关。将介绍使用PDA / CAPWAP系统进行成功测试的一般方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号