首页> 外文会议>Sino-Japanese Symposium on Geotechnical Engineering; 20031029-30; Beijing(CN) >DISPLACEMENT BACK ANALYSIS OF ELASTO -PLASTIC MODEL ON STAGED CONSTRUCTION OF PIT FOUNDATION
【24h】

DISPLACEMENT BACK ANALYSIS OF ELASTO -PLASTIC MODEL ON STAGED CONSTRUCTION OF PIT FOUNDATION

机译:基坑分阶段施工的弹塑性模型位移反分析

获取原文
获取原文并翻译 | 示例

摘要

For plastic deformation of soil during the excavation of pit foundation, this paper used elasto-plastic model with Mohr-Coulomb criterion to stimulate construction process, besides, elasto-plastic back analysis technique on staged construction is proposed. With Genetic Algorithm of global optimization, the elastic modules of soils were back calculated with the measured horizontal displacement of D/Wall, then to predict the deformation of D/Wall with back-calculated elastic module. This method was employed to simulate the construction process and predicted the deformation of D/Wall in the subway excavation.
机译:针对基坑开挖过程中土体的塑性变形,本文采用基于Mohr-Coulomb准则的弹塑性模型来刺激施工过程,并提出了分阶段施工的弹塑性反分析技术。利用全局优化遗传算法,利用测得的D / Wall水平位移反算土的弹性模量,然后利用反算的弹性模量预测D / Wall的变形。该方法用于模拟施工过程并预测地铁开挖中D / Wall的变形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号