A hierarchical simulation model for workload analysis of ship block erection process

机译:船体安装过程工作量分析的分层仿真模型

获取原文

摘要

In shipbuilding, large blocks are erected and welded in a dry dock to form a ship. Due to limited number of docks, which is major facility constraint in a shipyard, block erection process is typically considered as the bottleneck of the whole shipbuilding process. A complex erection network plan should be established for block erection which indicates the erection orders as well as the schedule of each erection event. Besides, each erection event consists of several sub-processes, which leads to high dependency of block erection on erection network. In this research, a hierarchical simulation model is suggested to precisely predict the workload of block erection considering the workload of each sub-processes included. By applying proposed model in erection network simulation, more accurate workload of block erection could be calculated.
机译:在造船中,将大砖块竖立并焊接在干船坞中以形成船。由于码头数量有限,这是造船厂的主要设施限制,因此通常将砌块安装过程视为整个造船过程的瓶颈。应该为块安装建立一个复杂的安装网络计划,该计划指示安装顺序以及每个安装事件的时间表。此外,每个安装事件都由几个子过程组成,这导致块安装对安装网络的高度依赖。在这项研究中,提出了一种分层仿真模型,以考虑所包含的每个子流程的工作量来精确预测块安装的工作量。通过将所提出的模型应用到架设网络仿真中,可以计算出更准确的砌块架设工作量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号