Most of the Hydro Power Stations especially the run-of-the river schemes fed by perennial rivers originating from Himalayas are plagued by the enormous amount of silt carried by the river waters especially during monsoon season. It is not only the quantity of silt measured in terms of PPM, some times as high as 10,000 PPM, but the adrasive nature of the silt containing high percentage of quartz particles measuring a hardness of 7 on Mohr's scale that cause extensive damage to Hydromechanical components.
机译:大多数水力发电站,尤其是喜马拉雅山脉多年生河流提供的流水方案,尤其是在季风季节,河水携带的大量泥沙困扰。不仅是按PPM测得的淤泥量(有时高达10,000 PPM),而且还含有高百分比石英颗粒(其摩尔数为7)的石英颗粒,其淤浆的侵蚀性对液压机械组件造成了广泛破坏。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号