首页> 外文期刊>Indian journal of power and river valley development >Nathpa Jhakri hydroelectric project - optimisation of tailrace outfall and Rampur intake: an overview of planning and design aspects
【24h】

Nathpa Jhakri hydroelectric project - optimisation of tailrace outfall and Rampur intake: an overview of planning and design aspects

机译:纳斯帕贾克里(Nathpa Jhakri)水电项目-优化尾水排放和Rampur进水口:规划和设计方面的概述

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Nathpa Jhakri hydroelectric project is the largest underground powerhouse of the country, producing 1500 MW under one roof. Besides, the largest underground desilting complex of the world; the longest HRT of the world and one of the deepest and most voluminous surge shafts in the world are also the pride of the project. The project has seen many landmark designs and has become a watershed for the art of hydroelectric engineering in India. The first unit of 250MW of the project was commissioned on 14 October 2003; the 2nd was commissioned on 28th November 2003. Remaining units will be commissioned, one by one, by the end of July 2004.
机译:纳斯帕贾克里(Nathpa Jhakri)水电项目是该国最大的地下发电厂,在一个屋顶下可发电1500兆瓦。此外,世界上最大的地下清淤设施;世界上最长的HRT和世界上最深,数量最多的调压井之一也是该项目的骄傲。该项目已经看到了许多具有里程碑意义的设计,并成为印度水力发电工程的分水岭。该项目的第一台250兆瓦机组已于2003年10月14日投入运行;第2座机组于2003年11月28日投入使用。其余机组将在2004年7月底之前逐一投入调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号