首页> 外文会议>Silting problems in hydro power plants >Problems faced in operation and maintenance stage in hydroelectric projects due to sediment transport in himalayan rivers - a case study - baira siul h.e. project
【24h】

Problems faced in operation and maintenance stage in hydroelectric projects due to sediment transport in himalayan rivers - a case study - baira siul h.e. project

机译:由于喜马拉雅河流域的泥沙输送,水电项目在运营和维护阶段面临的问题-案例研究-Baira Siul h.e项目

获取原文
获取原文并翻译 | 示例

摘要

The Hydro Electric Projects located on the Himalayan rivulets, the major operational hazard is due to silt. The paper describes a case study indicating the desilting arrangements, the problems experienced in maintenance of these structures and operating the power project optimally taking necessary precautions.
机译:位于喜马拉雅河小溪上的水力发电项目,主要的操作危险是由于淤泥。本文描述了一个案例研究,其中指出了排泥装置,这些结构的维护以及电力项目的运营过程中遇到的问题,并采取了必要的预防措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号