首页> 美国政府科技报告 >Bolton Falls Hydroelectric Redevelopment Project: Final operation and maintenance report. Small-Scale Hydroelectric Power Demonstration Project.
【24h】

Bolton Falls Hydroelectric Redevelopment Project: Final operation and maintenance report. Small-Scale Hydroelectric Power Demonstration Project.

机译:博尔顿瀑布水电开发项目:最终运行和维护报告。小型水电示范工程。

获取原文

摘要

This report provides a final accounting of the operation and maintenance costs from the first two year of operation of the Hydroelectric Demonstration Project located in Duxbury, Vermont. Prior to construction, Green Mountain Power (GMP) executed a Cooperative Agreement with the US Department of Energy (DOE) Number FC07-79RA23212 which contributed $2,621,609 toward the construction of the facility. A separate report covering the design, technical, construction, legal, institutional, environmental and other related aspects of the total project was furnished to DOE previously for publication as the ''Final Technical and Construction Cost Report'' dated March 3, 1988. This report discusses GMP's operating experience with the units as well as operation and maintenance costs for the first 24 months of operation. 8 figs., 4 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号