Enhancing the reliability of planning is the key to achieving stable construction flow and, subsequently, high productivity and improved product quality. Traditional look-ahead scheduling tools are not suitable for producing robust work schedules. Being aware of the inherent problems in traditional scheduling methods, we propose an improved scheduling tool, the Integrated Production Scheduler system, to help produce quality-assured look-ahead schedules by incorporating integrated information on the availability of resources and information into activities. This tool is developed specially for implementing Lean Construction philosophy in construction process design. Its principles for achieving a quality, timely and transparent schedule are described in this paper. It is based on a distributed scheduling model with the utilization of Internet technologies, such asJavaBeans and XML.
机译:提高计划的可靠性是实现稳定的施工流程,进而提高生产率和改善产品质量的关键。传统的提前计划工具不适合生成可靠的工作计划。考虑到传统调度方法中固有的问题,我们提出了一种改进的调度工具,即“综合生产调度程序”系统,通过将有关资源和信息可用性的集成信息整合到活动中来帮助制定质量有保证的提前调度。该工具是专为在施工过程设计中实施精益施工理念而开发的。本文描述了其实现高质量,及时和透明时间表的原则。它基于利用Internet技术(例如JavaBeans和XML)的分布式调度模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号