首页> 外文会议>Safety-critical Systems Symposium; 20070213-15; Bristol(GB) >Independently Assessing Legacy Safety Systems
【24h】

Independently Assessing Legacy Safety Systems

机译:独立评估传统安全系统

获取原文
获取原文并翻译 | 示例

摘要

It is not uncommon for large-scale safety-related engineering projects to make use of legacy systems that are either reused as is, or reused with modifications. Projects of this type can require the use of independent assessment as part of the regulatory approval process. Providing an independent assessment of such a project brings with it particular challenges related to issues of cross-acceptance, of the value of historical operational claims, and of supply chains involving international organisations sometimes with their own independent assessors. In this paper the various characteristics of large-scale engineering projects are outlined, together with their impact on an independent assessor. Lessons for independent assessors are identified.
机译:大规模的与安全相关的工程项目使用遗留系统的情况并不少见,这些遗留系统既可以按原样重用,也可以在修改后重用。这种类型的项目可能需要使用独立评估作为监管批准流程的一部分。对此类项目进行独立评估会带来与交叉接受,历史业务索偿的价值以及涉及国际组织的供应链(有时带有自己的独立评估人)有关的特殊挑战。本文概述了大型工程项目的各种特征,以及它们对独立评估者的影响。确定了独立评估者的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号