首页> 外文会议>Rock mechanics: achievements and ambitions >On rationality of the construction methods for wearing tunnels
【24h】

On rationality of the construction methods for wearing tunnels

机译:穿隧施工方法的合理性

获取原文
获取原文并翻译 | 示例

摘要

A certain tunnel wears under the highway, and the clear distance from its vault to the highway pavement is about 3.5 to 5 meters. To ensure that the safety of the highway structure under the construction process, it is required to strictly control the surrounding rock of the tunnel from deforming, partly destroyed or losing stability. In this paper, the software Z_Soil3D is adopted to make a stimulated calculation and analysis of 6 suggested construction schemes under the dynamic process of construction. Besides, a comprehensive evaluation was made mainly on four aspects, including the maximum amount of road surface subsidence, the range of road transverse subsidence, etc. And some reasonable construction methods are proposed.
机译:某条隧道在高速公路下方磨损,从其地下室到高速公路人行道的净距离约为3.5至5米。为了保证施工过程中公路结构的安全,要求严格控制隧道围岩的变形,部分破坏或失稳。本文采用Z_Soil3D软件对动态施工过程中6种建议的施工方案进行了激励计算和分析。此外,主要从最大的路面沉降量,路面的横向沉降范围等四个方面进行了综合评价。并提出了一些合理的施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号