首页> 外文会议>Rapid Excavation and Tunneling Conference 2015 proceedings >THE NEW AND OLD BEBENROTH TUNNEL PROJECT IN GERMANY—TUNNELLING AS PART OF THE DEUTSCHE BAHN TUNNEL INFRASTRUCTURE SAFETY UPGRADE PROGRAM
【24h】

THE NEW AND OLD BEBENROTH TUNNEL PROJECT IN GERMANY—TUNNELLING AS PART OF THE DEUTSCHE BAHN TUNNEL INFRASTRUCTURE SAFETY UPGRADE PROGRAM

机译:德国的新旧贝本罗斯隧道项目-隧道技术是德国巴恩隧道基础设施安全升级计划的一部分

获取原文
获取原文并翻译 | 示例

摘要

A few years ago the Deutsche Bahn (German Federal Railways) launched its extensiverntunnel safety upgrade program for its existing, partially more than 140 year old, doublerntrack tunnel infrastructure. To maintain the maximum operation capacity during the constructionrnphase the general concept includes construction of new single track tunnelsrnnext to the existing structures followed by the refurbishment of the old tunnels once thernnew tunnels are completed. The whole construction activities ranging from standardrnsequential excavation for the newly built tunnel and cross passages to the refurbishmentrnof the old tunnel, requires a vast variety of tunnelling tasks which will be explainedrnbased on the case study of the New and Old Bebenroth-Tunnel.
机译:几年前,德国联邦铁路(Deutsche Bahn,德国联邦铁路)对其现有的,已有140多年历史的双轨隧道基础设施启动了广泛的隧道安全升级计划。为了在施工阶段保持最大的运营能力,一般概念包括在现有结构旁边建造新的单线隧道,然后在新隧道竣工后对旧隧道进行翻新。从新建隧道和交叉通道的标准顺序开挖到旧隧道的整修,整个建筑活动都需要各种各样的隧道作业,这些工作将根据新旧贝本罗特隧道的案例进行解释。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号