首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >THE DULLES CORRIDOR METRORAIL PROJECT-EXTENSION TO DULLES INTERNATIONAL AIRPORT AND ITS TUNNELING ASPECTS
【24h】

THE DULLES CORRIDOR METRORAIL PROJECT-EXTENSION TO DULLES INTERNATIONAL AIRPORT AND ITS TUNNELING ASPECTS

机译:杜勒斯走廊地铁项目扩展到杜勒斯国际机场及其隧道方面

获取原文
获取原文并翻译 | 示例

摘要

The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority's Metrorail service to Washington Dulles International Airport and beyond to Route 772 in Loudoun County, Virginia. The roughly 37 kilometers long, double track alignment involves two 700 meters long single track, soft ground NATM tunnels at Tysons Corner, two 3.3 kilometers long single track rock TBM tunnels at Dulles Airport and one 25-meter deep station at the airport to be constructed by NATM in sedimentary rock. The design-build project is being implemented in a Public-Private-Partnership. A joint venture of Bechtel and Washington Group International has concluded the preliminary engineering and construction is scheduled to start in late 2007.
机译:弗吉尼亚州铁路和公共交通部门以及大都会华盛顿机场管理局正在将华盛顿大都会运输局的地铁服务扩展至华盛顿杜勒斯国际机场,并扩展至弗吉尼亚州劳登县的772号公路。大约37公里长的双轨路线涉及泰森斯角的两条700米长的单轨软地面NATM隧道,杜勒斯机场的两条3.3公里长的单轨岩石TBM隧道以及该机场将要建设的25米深的车站由NATM在沉积岩中。设计-建造项目正在以“公共-私人-伙伴关系”的形式实施。柏克德与华盛顿国际集团的合资企业已经完成了初步的工程和建设,计划于2007年下半年开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号