首页> 外文会议>Rapid Excavation and Tunneling Conference >THE DULLES CORRIDOR METRORAIL PROJECT-EXTENSION TO DULLES INTERNATIONAL AIRPORT AND ITS TUNNELING ASPECTS
【24h】

THE DULLES CORRIDOR METRORAIL PROJECT-EXTENSION TO DULLES INTERNATIONAL AIRPORT AND ITS TUNNELING ASPECTS

机译:杜勒斯走廊阵风项目 - 延伸到杜勒斯国际机场及其隧道方面

获取原文

摘要

The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority's Metrorail service to Washington Dulles International Airport and beyond to Route 772 in Loudoun County, Virginia. The roughly 37 kilometers long, double track alignment involves two 700 meters long single track, soft ground NATM tunnels at Tysons Corner, two 3.3 kilometers long single track rock TBM tunnels at Dulles Airport and one 25-meter deep station at the airport to be constructed by NATM in sedimentary rock. The design-build project is being implemented in a Public-Private-Partnership. A joint venture of Bechtel and Washington Group International has concluded the preliminary engineering and construction is scheduled to start in late 2007.
机译:弗吉尼亚州铁路和公共交通部和大都会华盛顿机场管理局正在延伸华盛顿大都会区交通管理局到华盛顿杜勒斯国际机场及以后的弗吉尼亚州劳登县的公路772号公路。大约37公里长,双轨道对齐涉及两条700米长的单轨,泰森角的软接地NATM隧道,两个3.3公里长的单轨岩TBM TBM TBM隧道,在杜勒斯机场和一个25米深站的机场被建造在沉积岩中的Natm。设计 - 构建项目正在公私伙伴关系中实施。 Bechtel和华盛顿集团国际合资企业缔结了初步工程和建设计划于2007年底开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号