首页> 外文会议>Proceedings of the seventh Americas conference on information systems >USING THE INTEGRATED ACTIVITY-BASED COSTING AND ECONOMIC VALUE ADDED INFORMATION SYSTEM FOR PROJECT MANAGEMENT
【24h】

USING THE INTEGRATED ACTIVITY-BASED COSTING AND ECONOMIC VALUE ADDED INFORMATION SYSTEM FOR PROJECT MANAGEMENT

机译:使用基于活动的综合成本和经济价值附加信息系统进行项目管理

获取原文
获取原文并翻译 | 示例

摘要

This paper examines the use of the Integrated ABC-and-EVA Information System for the management of newrntechnology projects. The advantages of integrating the Activity-Based Costing system with the Economic ValuernAdded financial performance measure and the positive impacts of this integration on project costing arernpresented. The effect of the Integrated Information System on overall project performance is discussed. Finally,rnbuilding on the preliminary findings of its worth and effectiveness, suggestions for future research in using thernIntegrated ABC-and-EVA Information System for project management are made.
机译:本文研究了将ABC和EVA集成信息系统用于新技术项目的管理。提出了将基于活动的成本核算系统与经济价值增加的财务绩效指标相集成的优势,以及这种集成对项目成本核算的积极影响。讨论了综合信息系统对整体项目绩效的影响。最后,在初步研究其价值和有效性的基础上,提出了将ABC和EVA集成信息系统用于项目管理的未来研究建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号