【24h】

DOWNGRADE OF THE SAVANNAH RIVER SITE’S FB-LINE

机译:萨凡纳河站点FB-LINE的降级

获取原文
获取原文并翻译 | 示例

摘要

This paper will discuss the Safeguards & Security (S&S) activities that resulted in the downgrade of thernSavannah River Site’s FB-Line (FBL) from a Category I Material Balance Area (MBA) in a MaterialrnAccess Area (MAA) to a Category IV MBA in a Property Protection Area (PPA). The Safeguardsrnactivities included measurement of final product items, transferal of nuclear material to other SavannahrnRiver Site (SRS) facilities, discard of excess nuclear material items, and final measurements of holduprnmaterial. The Security activities included relocation and destruction of classified documents andrnrepositories, decertification of a classified computer, access control changes, updates to planningrndocuments, deactivation and removal of security systems, Human Reliability Program (HRP) removals,rnand information security training for personnel that will remain in the FBL PPA.
机译:本文将讨论导致萨凡纳河站点的FB-Line(FBL)从MaterialrnAccess Area(MAA)的I类物料平衡区(MBA)降级为IV MBA的保障和安全(S&S)活动。财产保护区(PPA)。保障措施包括最终产品的测量,将核材料转移到其他SavannahrnRiver Site(SRS)设施,丢弃多余的核材料以及对残留物的最终测量。安全活动包括迁移和销毁机密文件和存储库,取消机密计算机的认证,访问控制更改,规划文件的更新,停用和移除安全系统,清除人类可靠性计划(HRP),以及对将要保留的人员进行信息安全培训在FBL PPA中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号