首页> 外文会议>Proceedings of the IASTED International Conference on Energy and Power Systems >EXPERIMENTAL EXAMINATION OF WIND GENERATOR SYSTEM WHICH INTRODUCED MPPT IN WIND COLLECTION EQUIPMENT
【24h】

EXPERIMENTAL EXAMINATION OF WIND GENERATOR SYSTEM WHICH INTRODUCED MPPT IN WIND COLLECTION EQUIPMENT

机译:在风收集设备中引入MPPT的风发生器系统的实验检查

获取原文
获取原文并翻译 | 示例

摘要

This paper proposes that wind generator system is operated by using wind collection equipment and Maximum Power Point Tracking more and more highefficient. As an example of the utility, it was proposed that it was used for the regeneration of electric vehicle. The efficiency upgrading of electric vehicle can be expect by introducing in addition, proposing system with the conventional regeneration. The field experiment was carried out in order to measure the effect. Regeneration energy by proposing and new regeneration system was measured. The experiment was carried out by the installation of wind collection equipment, Maximum Power Point Tracking. As the result, the wind given to the wind power generator was accelerated by wind collection equipment, and Maximum Power Point Tracking (MPPT) made the output voltage increase.
机译:提出了利用集风设备和最大功率点跟踪越来越高的效率来运行风力发电机系统。作为实用程序的示例,提出了将其用于电动车辆的再生。另外,通过引入具有常规再生的提议系统,可以期待电动汽车的效率提升。为了测量效果进行了现场实验。通过提议和新的再生系统测量了再生能量。该实验是通过安装集风设备“最大功率点跟踪”来进行的。结果,给风发电机提供的风被集风设备加速,最大功率点跟踪(MPPT)使得输出电压增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号