首页> 外文会议>Proceedings of conference 31 >Fast-track erosion protection and sediment control at a mountain resort
【24h】

Fast-track erosion protection and sediment control at a mountain resort

机译:避暑山庄的快速通道侵蚀保护和泥沙控制

获取原文
获取原文并翻译 | 示例

摘要

Extensive erosion protection and sediment control work was conducted during 1996-97 at Schweitzer Mountain Resort in nothern ldaho in response to conditions set forth in a COnsent Order previsously issued by the State Division of Environmental Quality (DEQ). The order was intended to correct stormwater management and erosion problems, and thus mitigate sediment delivery to the Schweitzer Creek drainage. The task was challenging due to the steep terrain, high altitude, poor soils, short grwoing season, and limited working areas on ski runs.
机译:为了响应州环境质量局(DEQ)事先发布的一项共同命令中规定的条件,1996年至97年在北达科他州的Schweitzer Mountain Resort进行了广泛的侵蚀保护和沉积物控制工作。该命令旨在纠正雨水管理和侵蚀问题,从而减少沉积物向Schweitzer Creek排水的输送。由于地形陡峭,海拔高,土壤贫瘠,生长季节短以及滑雪道上的工作区域有限,因此这项任务具有挑战性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号