Extensive erosion protection and sediment control work was conducted during 1996-97 at Schweitzer Mountain Resort in northern Idaho in response to conditions set forth in a Consent Order previously issued by the State Division of Environmental Quality (DEQ). The order was intended to correct stormwater management and erosion problems, and thus mitigate sediment delivery to the Schweitzer Creek drainage. The task was challenging due to the steep terrain, high altitude, poor soils, short growing season, and limited working areas on ski runs. In addition, heavy runoff in the early spring of 1997 damaged many of the initial controls and practices installed in 1996, increasing the importance and urgency of work to be completed in 1997. Erosion control methods used during this fast-track operation included surface texturing on bare slopes, revegetation using organic soil amendments, erosion control blankets, wattles, and mulching with wood chips or grass hay. Sediment control practices focused on runoff control structures (including pipe slope drains), rock check dams and wattle check dams in runoff swales, a series of runoff detention basins (that also could serve as sediment ponds), and silt fence. The work proposed for 1997 began in June and continued through the summer as treatment areas dried out; the project was completed by mid-November to meet DEQ criteria. Follow-up inspections in 1996-99 confirmed that the treatments were successful, and that only minor cleanup and maintenance would be needed in some runoff ditches and detention ponds.
机译:广泛的侵蚀保护和沉积物控制工作是在1996 - 97年在北爱达荷州北部施韦策山度假村进行的,以应对先前由环境质量司(DEQ)颁布的同意令所载的条件。该命令旨在纠正雨水管理和侵蚀问题,从而减轻沉积物送到Schweitzer溪流排水。由于陡峭的地形,高海拔,差的土壤,矮小季节短,季节短暂,雪橇的有限工作区,这项任务挑战。此外,在1997年的初春重径流破坏许多安装在1996年最初的控制和做法,提高在这个快速轨道运行过程中使用的1997年侵蚀控制的方法来完成的重要性和工作的紧迫性包括表面纹理上裸露的斜坡,使用有机土壤修正,侵蚀控制毯,瓦特和木屑或草草堆覆盖的坡度。沉积物控制实践专注于径流控制结构(包括管道坡度),岩石滤压和荆棘阵雨在径流洼地中,一系列径流拘留盆(也可以用作沉积物池塘)和淤泥栅栏。 1997年拟议的工作开始于6月开始,夏季持续,因为治疗区干涸;该项目于11月中旬完成,以满足DEQ标准。 1996 - 99年的后续检查证实了治疗成功,在一些径流沟渠和拘留池塘中只需要轻微的清理和维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号