A new multi-span arch bridge over the Piave River in Venice:conceptual design and structural optimization

机译:威尼斯Piave河上一座新的跨跨拱桥:概念设计和结构优化

获取原文
获取原文并翻译 | 示例

摘要

Not infrequently, building yards of important infrastructures take remarkably long time to be accomplished and are characterized by several interruptions and resumptions. This is the case of the bridge over the Piave river in San Dona, an outstanding 500m arch structure on five bays of 100m each, located in a strategic area just outside the city of Venice-Italy. The interruption of the construction works was, for the case mentioned, contemporary to the introduction of a new regulation, the O.C.P.M. n 3274, concerning seismic design and seismic classification of the National territory. This fact, since the original project was characterized by a massive box girder concrete deck on pile foundations (thus not conceived for horizontal loads at first), gave rise to the necessity of starting with an updated design aiming to achieve a much lighter composite steel and concrete box girder deck. The new deck was connected to the already built piers by means of non conventional steel-to-concrete connections ensuring hogging moment resistance at supports, and it is characterized by a sophisticated aesthetics and by an optimized distribution of structural material obtained through an iterative design-and-check process. In the following paper, the structural optimization process aiming to reduce the weight of the superstructure of the bridge will be presented. This study follows a previous one based on a manual ESO (evolutionary structural optimization) performed into a FEM model (Zordan T. et al. 2010), for which all computer automatic procedures were been replaced by a step-by-step iterative process controlled by the designer. Now this results are compared to the ones coming from a totally automatic ESO procedure performed with Ansys V.12 software, and a semi-automatic procedure, that use Ansys topological optimization's results for identifying shape finally defined by the user himself.
机译:通常情况下,重要基础设施的建造场需要很长的时间才能完成,并且具有多次中断和恢复的特点。这就是San Dona的Piave河上的桥梁的例子,这是一个出色的500m拱形结构,位于五个分别为100m的海湾中,位于威尼斯意大利市区外的战略地区。对于上述情况,建筑工程的中断是引入新法规O.C.P.M. 3274,涉及国家领土的地震设计和地震分类。由于原始项目的特点是桩基上有一个巨大的箱梁混凝土甲板(因此一开始就没有考虑水平荷载),因此有必要开始进行更新设计,以实现轻得多的复合钢和混凝土箱梁甲板。新甲板通过非传统的钢对混凝土连接与已建成的墩连接,从而确保了支撑处的抗弯矩能力。它的特点是精致的外观以及通过迭代设计获得的结构材料的优化分布,并检查过程。在下文中,将提出旨在减轻桥梁上部结构重量的结构优化过程。这项研究是基于先前的研究,该研究基于对FEM模型执行的手动ESO(进化结构优化)的研究(Zordan T. et al。2010),为此,所有计算机自动程序都被逐步控制的迭代过程代替由设计师。现在,将该结果与使用Ansys V.12软件执行的全自动ESO过程以及使用Ansys拓扑优化结果识别用户最终定义的形状的半自动过程的结果进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号