首页> 外文会议>Proceedings of the 4th Conference on Systems Science, Management Science amp; System Dynamics. >Construction Projects Priority Selection of Trading Patterns based on Transaction Cost
【24h】

Construction Projects Priority Selection of Trading Patterns based on Transaction Cost

机译:基于交易成本的建设项目交易模式优先选择

获取原文
获取原文并翻译 | 示例

摘要

Transaction costs are ignored in the course of trading pattern selection of construction projects. Based on transaction cost theory, several common transaction models in construction projects such as EPC, DBB, CM, PM, BOT, and Construction Agents are chosen to analyze the main factors affecting their transaction costs. AHP is applied to quantify those factors into semi-quantitative analysis, through matrix operations to determine the priority order for those transaction models, and to provide a certain basis for the selection of construction project trading patterns. On this basis, and combined with the actual construction project case studies, ideas and suggestions are put forward for reducing transaction costs and countermeasures.
机译:在建设项目的交易方式选择过程中,交易成本被忽略。基于交易成本理论,选择了EPC,DBB,CM,PM,BOT和施工代理等建筑项目中几种常见的交易模型来分析影响其交易成本的主要因素。层次分析法将这些因素量化为半定量分析,通过矩阵运算确定这些交易模型的优先顺序,为建设项目交易模式的选择提供一定的依据。在此基础上,结合实际的建设项目案例研究,提出降低交易成本和对策的思路和建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号