OVERCOMING THE CHALLENGES ENDURED BY THE QUALITY ASSURANCE AND QUALITY CONTROL TEAMS DURING THE CONSTRUCTION OF A DEEP CUTOFF WALL IN EAST ALTON, ILLINOIS

机译:克服伊利诺伊州东部奥尔顿深挖墙的建造过程中质量保证和质量控制团队所带来的挑战

获取原文
获取原文并翻译 | 示例

摘要

The Lower Wood River Levee system, at the confluence of the Wood River Creek and the MississippirnRiver, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation wasrndeemed necessary by the Southwestern Illinois Flood Prevention District Council and the United StatesrnArmy Corp of Engineers (USACE). The experts enlisted by the council produced a design that providedrnfor constructing a cutoff wall approximately 2,000 feet long and up to 140 feet deep, through alluvialrnand outwash soils, and embedded in bedrock. This paper will describe the challenges faced by thernQuality Control (QC) and Quality Assurance (QA) teams due to the complex nature of the project inrnconjunction with an extremely thorough QC/QA program.
机译:伊利诺伊州东奥尔顿的伍德河溪和密西西比河交汇处的下伍德河堤防系统一直受到地下渗水的困扰,伊利诺斯州西南部防洪区议会和联合国在2010年认为有必要进行补救。 StatesrnArmy工程师公司(USACE)。理事会征集的专家进行了一项设计,该设计旨在通过冲积土和冲刷土壤并埋在基岩中,建造一堵约2000英尺长,深达140英尺深的防渗墙。本文将描述由于非常严格的QC / QA计划导致的项目合并的复杂性,质量控制(QC)和质量保证(QA)团队面临的挑战。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号