首页> 外文会议>Proceedings of 2012 IEEE 3rd international conference on emergency management and management sciences >A Duration-Cost Model for Estimate and Optimization in Projects Base on GERT
【24h】

A Duration-Cost Model for Estimate and Optimization in Projects Base on GERT

机译:基于GERT的项目估算和优化的工期成本模型

获取原文
获取原文并翻译 | 示例

摘要

In order to make accurate predictions and efficient arrangement for project activities, this paper studied on the relationship between duration and cost then built up a Duration-Cost model based on GERT to obtain required parameters.After a series of procedures, correlative parameters could be calculated through GERT methods and accurately estimate the duration and cost in a project.As a result, this model could provide new perspectives and solutions to project schedule and cost optimization.
机译:为了对项目活动进行准确的预测和有效的安排,本文研究了工期与成本之间的关系,然后建立了基于GERT的工期成本模型来获取所需参数,经过一系列程序后,可以计算出相关参数该模型可以通过GERT方法准确估算项目的工期和成本,从而为项目进度和成本优化提供新的视角和解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号