【24h】

Numerical analysis of application for induction caving roof

机译:感应冒顶应用的数值分析

获取原文
获取原文并翻译 | 示例

摘要

New method for handling roof of the base successive mining is proposed, which is induction caving in the roof. The key is that it is made certain to the station of the space-time in the induction caving roof, as the stress is released with the mining process. And applying the catastrophe theory, the influencing factors of induction caving roof are studied in the emptied areas, such as the mechanical property of the surrounding rock, the area of the gob, the scope and dimension of tensile stress. The results show that the key factor is the area of the gob to the method of the induction caving roof. Then according to the geology and the ore characteristic, the three dimension FEM mechanical model is built in Tongkeng Mine, the laws of the tensile stress are analyzed to the space and the time in the roof with the mining, then it is rational design to the mine step and time of the handing the roof.
机译:提出了一种处理基础连续开采顶板的新方法,即在顶板中进行感应放顶。关键是要确保感应放空顶上时空的位置,因为应力随开采过程而释放。并运用突变理论,研究了空洞区域感应冒顶的影响因素,如围岩的力学性能,采空区的面积,拉应力的范围和大小等。结果表明,感应冒顶方法的关键因素是采空区的面积。然后根据地质特征和矿石特性,在铜坑矿建立三维有限元力学模型,分析采动时顶板空间和时间的拉应力规律,然后合理设计。挖掘屋顶的步骤和时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号