PIPELINES HANGING FROM BRIDGES – UNIQUE DESIGN PROBLEMSTO OVERCOME, UNIQUE SOLUTIONS TO CONSTRUCT

机译:悬挂在桥梁上的管道–克服独特的设计问题,构造独特的解决方案

获取原文
获取原文并翻译 | 示例

摘要

The Golden State Water Company (GSWC) serves more than 1 in 20 Californiansrnwith drinking water, which is a total of over 1.5 million customers. They serve arndiverse number of water systems located all over the state, including SouthernrnCalifornia. The Central District includes the cities of Bell and Bell Gardens. The tworncities have diverse sources of supply including surface supplies and somerngroundwater. In order to improve the water supply reliability of both systems,rnGSWC decided to construct a 12-inch main connecting the two distribution systems.rnThe distance between the systems is about 1,400 feet (ft); however, it includes severalrndaunting obstacles. A long bridge across the Los Angeles River and another bridgernacross the 710 freeway are between the two water systems, along with a multitude ofrnutilities including gas, petroleum, communication ducts, water mains, and storm andrnsanitary sewers. Permits must be obtained from the California Department ofrnTransportation (Caltrans), the statewide transportation agency, both cities, and severalrnutilities with prior rights-of-way.rnDuring 2007 and 2008, a pipeline design was prepared that included special featuresrnto overcome the multitude of obstacles. During late 2008 and early 2009, the pipelinernwas constructed. This paper documents the design decisions that were made and thernresulting construction that implemented the design features. Some of the importantrndecisions that will be discussed include:rn1. Pipe material selection, for buried segments as well as suspended segmentsrnhanging from the two bridges.rn2. Design and construction of a 450-ft pipeline span across the Los Angeles Riverrnbridge taking advantage of a corridor currently used by a large telephone duct andrna gas pipeline, while avoiding these utilitiesrn3. Design and construction of a 150-ft pipeline span across the 710 freeway, one ofrnSouthern California’s busiest truck routes out of the Long Beach Harbor, so that
机译:金州自来水公司(GSWC)为加利福尼亚州每20名居民中的超过1名提供饮用水,总共有150万用户。它们为遍布全州(包括南加利福尼亚州)的供水系统提供多种服务。中央区包括贝尔市和贝尔花园市​​。这两个城市的供应来源多种多样,包括地表供应和地下水。为了提高两个系统的供水可靠性,rnGSWC决定构建一个12英寸的主管道来连接两个分配系统。rn系统之间的距离约为1400英尺(英尺);但是,它包括几个艰巨的障碍。两条水系统之间有一条横跨洛杉矶河的长桥和一条横跨710号高速公路的桥,以及大量的公用设施,包括天然气,石油,通讯管道,水管以及雨水和卫生污水管。必须从加利福尼亚州交通运输部(Caltrans),州范围内的交通运输机构,两个城市以及具有优先通行权的几个公用事业公司获得许可证。在2007年和2008年期间,准备了包括特殊功能的管道设计,以克服众多障碍。 。在2008年末和2009年初,管道已建成。本文记录了做出的设计决策以及实现设计特征的结果构造。将要讨论的一些重要决定包括:1。管道材料的选择,适用于埋入式管段以及从两座桥梁悬挂的悬挂管段。利用目前由大型电话管道和天然气管道使用的走廊,设计和建造横跨洛杉矶河大桥的450英尺长的管道,同时避免使用这些公用设施。设计和建造一条横跨710高速公路的150英尺长的管道,这是南加州最繁忙的卡车路线之一,它是从长滩港出来的,

著录项

  • 来源
  • 会议地点 San Diego CA(US);San Diego CA(US)
  • 作者

    Ruben Trigueros; Robert Carley;

  • 作者单位

    Golden State Water Company, Central District, 12035 Burke Street, Suite 1,rnSanta Fe Springs, CA 90670 Tel: 562-907-9200 Fax: 562-907-7060;

    rnCH2M HILL, 6 Hutton Centre Drive, Suite 700, Santa Ana, CA 92707;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;