Several Failures of a 16-inch PVC Transmission Main within 12 Years

机译:16英寸PVC传输主线在12年内发生的几次故障

获取原文
获取原文并翻译 | 示例

摘要

Eight breaks have occurred on a 16-inch diameter recycled water transmissionrnpipeline, most recently in October 2008. After a break in September 2006, becausernthe pipeline is only about 12 years old, an investigation was structured to determine ifrnthere is a systematic problem. Two of the most recent breaks occurred less than 100rnfeet apart, in Kanan Road, near its intersection with Hawthorne Drive, in the OakrnPark area of Ventura County, California. The five most recent failures-in 1999,rn2003, 2006, 2007, and 2008-necessitated round-the-clock emergency repairs withrnthe associated impacts to traffic and the public.rnThe pipeline was constructed of PVC that was specified as conforming to AWWArnStandard C905. Pipe manufactured to that standard has a nominal design safety factorrnof 2.0 at 100,000 hours (11.4 years) of service at its rated pressure. This particularrnpipe is DR-25, which is rated for 165 pounds per square inch (psi) (without surge),rnand the static pressure is approximately 140 psi at the most recent point of failure.rnThis paper describes the investigation into the possible causes of failure,rnincluding conducting laboratory tests, surge analyses, and design replication. The riskrnto continued operation of the pipeline (expecting to have further breaks) wasrnaddressed along with repair and replacement as means of addressing the continuedrnlongevity of the pipeline.
机译:在直径为16英寸的循环输水管道上发生了8次中断,最近一次是在2008年10月。在2006年9月发生中断之后,由于该管道只有12年的历史,因此进行了一项调查以确定是否存在系统性问题。最近的两次断裂发生在相距不到100rnfeet的地方,位于加利福尼亚州文图拉县OakrnPark地区靠近Hawthorne Drive的Kanan Road。最近的五次故障-在1999年,2003年,2006年,2007年和2008年-需要全天候进行紧急维修,并对交通和公众造成影响。管线由PVC制成,其规格符合AWWArnStandard C905。按照该标准制造的管道在其额定压力下工作100,000小时(11.4年)时,其名义设计安全系数为rnof 2.0。这种特殊的管子是DR-25,额定值为165磅每平方英寸(psi)(无喘振),在最近的故障点处的静压力约为140 psi。失败,包括进行实验室测试,浪涌分析和设计复制。解决了管道继续运行的风险(预计会有进一步的中断),同时进行了修理和更换,以解决管道持续使用寿命的问题。

著录项

  • 来源
  • 会议地点 San Diego CA(US);San Diego CA(US)
  • 作者单位

    Calleguas Municipal Water District, 2100 Olsen Rd., Thousand Oaks, CArn91360-6800. Telephone (805) 579-7118, Facsimile (805) 526-3675, rbeamer@calleguas.com;

    rnCalleguas Municipal Water District, 2100 Olsen Rd., Thousand Oaks, CArn91360-6800. Telephone (805) 526-9323, Facsimile (805) 526-3675, dkendall@calleguas.com;

    rnAECOM, 1501 Quail Street, Newport Beach, California 92660-9020. Telephonern949-476-3546, Facsimile 949-721-7482, andy.romer@aecom.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;
  • 关键词

  • 入库时间 2022-08-26 14:13:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号