首页> 外文会议>Pipelines 2007: advances and experiences with trenchless pipeline projects >TURN-KEY CONDITION ASSESSMENT AND REHABILITATION/REPLACEMENT SOLUTION FOR AN EFFLUENT FORCE MAIN
【24h】

TURN-KEY CONDITION ASSESSMENT AND REHABILITATION/REPLACEMENT SOLUTION FOR AN EFFLUENT FORCE MAIN

机译:主要出力条件的交钥匙状态评估和修复/更换解决方案

获取原文
获取原文并翻译 | 示例

摘要

The City of West Palm Beach constructed approximately 6 miles of effluent force mains in 1974 extending from 23rd Street using 42" Pre-stressed Concrete Cylinder Pipe (PCCP) and from Congress Ave using 48" PCCP to the East Central Regional Wastewater Treatment Plant within the City. The force mains normally run below the prevailing water table or are subject to wetting and drying cycles and are generally now below multi-lane paved surfaces. The City had experienced failures and wanted a complete investigation into the cause and extent of any possible deterioration/distress while the force main remained in service. The City also wanted to get recommendations for a possible rehabilitation and replacement program.rnThe Pressure Pipe Inspection Company (PPIC) led a team comprising of Jordan, Jonesrnand Goulding (JJG), Jason Consultants and an excavation contractor to provide the City with a complete turn-key solution. This paper will discuss the methods used to determine the existing condition of the force main: Acoustic emission testing, historic H_2S readings, chemical dosing records, repair/maintenance records, local soil conditions, hydraulic model runs, as well as the stress and strain in the PCCP elements. Additionally, it will cover the recommendations made to the City for a rehabilitation and replacement program, and highlight the advantages of a turn-key solution.
机译:西棕榈滩市于1974年从23街开始使用42英寸预应力混凝土圆筒管(PCCP)修建了大约6英里的污水干管,从国会大街使用48英寸PCCP延伸到会展大道,一直延伸至东区中央废水处理厂市。力管通常在盛行的地下水位以下运行,或经受湿润和干燥循环,现在通常在多车道铺设的表面以下。纽约市经历过故障,希望在部队总队继续服役期间对可能的恶化/遇难原因和程度进行全面调查。纽约市还希望获得有关可能的修复和更换计划的建议。rn压力管道检查公司(PPIC)领导了一个由约旦,琼斯南德·古尔丁(JJG),杰森顾问和挖掘承包商组成的团队,为纽约市提供完整的转弯服务。键解决方案。本文将讨论用于确定力主条件的方法:声发射测试,历史H_2S读数,化学剂量记录,维修/保养记录,当地土壤条件,水力模型运行以及应力和应变。 PCCP元素。此外,它将涵盖向纽约市提出的有关修复和置换计划的建议,并强调交钥匙解决方案的优势。

著录项

  • 来源
  • 会议地点 Boston MA(US);Boston MA(US)
  • 作者单位

    Pressure Pipe Inspection Company Ltd., 4700 Dixie Rd, Mississauga, Ontario, Canada, L4W 2R1 Phone: (905) 624-1040, email info@ppic.com;

    rnJordan, Jones and Goulding., 6801 Governors Lake Parkway, Norcross, GA, USA, 30071 Phone: (678) 333-0380, email nstubbiefield@JJG.com;

    rnWest Palm Beach Utilities., 1000 45th Street, West Palm Beach, FL, USA, 33407 Phone: (561) 494-1040, email MCraig@wpb.org;

    rnJason Consultants, LLC, 1875 I Street NW, Suite 500, Washington, DC, USA, 20006 Phone: (740) 587-0966, email robert.morrison@jasonconsult.com;

    rnPressure Pipe Inspection Company Ltd., 4700 Dixie Rd, Mississauga, Ontario, Canada, L4W 2R1 Phone: (905) 624-1040, email info@ppic.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道输送;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号