Lake Tawakoni Water Supply Project,Critical Path Issues and Lessons Learned:Fast-Tracking a $100 million Water Transmission Project

机译:塔瓦科尼湖供水项目,关键路径问题和经验教训:快速跟踪一个耗资1亿美元的输水项目

获取原文
获取原文并翻译 | 示例

摘要

Since its formation in 1951, the North Texas Municipal Water District hasrnbeen charged with developing a reliable water supply source for its 13 member citiesrnand 46 other customers (some direct and some indirect), including more than 1.5rnmillion people in portions of north Texas including portions of Collin, Dallas,rnDenton, and Kaufman Counties and all of Rockwall County. Recent long-rangernwater supply planning efforts have identified significant increases in water demandsrnthat must be met through a corresponding increase in available raw water supply.rnCompounding the need for raw water is the fact that the North Texas region isrncurrently in the second year of a drought that is the worst on record since the 1950s,rnwith the District's primary water supply reservoir, Lake Lavon, falling some 17 feetrnin water surface elevation since mid-2005.rnIn an effort to supplement available supplies, the District contracted forrn50,000 acre-feet of water per year from the Sabine River Authority in LakernTawakoni, located approximately 45 miles east of Dallas in October 2005. Givenrncurrent drought conditions and ominous rainfall forecasts, the District has requestedrnthat the infrastructure needed to transfer this water from Lake Tawakoni to LakernLavon be in service no later than October 1, 2007, to prevent further water restrictionsrnand possible water rationing. The infrastructure needed includes approximately 30rnmiles of 54 and 60-inch-diameter transmission pipeline and two pump stations, eachrnwith a raw water pumping capacity of 75 MGD. The estimated project cost is $100rnmillion. Critical path issues for meeting the highly accelerated schedule includernoverall project team coordination; route selection; environmental permittingrnconsiderations; easement and property acquisition; power supply; equipment delivery;rnand construction of multiple project components simultaneously. The focus of thisrnpaper is to discuss the critical path issues and offer lessons learned from fast-trackingrnthe design and construction of a multi-million dollar water transmission project.
机译:自1951年成立以来,北德克萨斯市政水区一直负责为其13个会员城市和其他46个客户(部分直接或部分间接)开发可靠的水源,其中包括德克萨斯州北部部分地区超过150亿人的科林,达拉斯,rnDenton和考夫曼县以及整个Rockwall县。最近的长期供水计划工作已经确定了需水量的显着增加,必须通过相应增加可用原水的供给来满足。rn对原水的需求是事实,北德克萨斯州正处于干旱第二年,这是自1950年代以来有记录以来最严重的一次,该地区的主要供水水库拉芳湖自2005年中以来的水位下降了约17英尺。在为补充现有水源方面,该地区收缩了50,000英亩英尺的水。 2005年10月,位于达拉斯以东约45英里的塔瓦科尼湖萨宾河管理局每年提供的水量。鉴于当前的干旱条件和不祥的降雨预报,该地区要求将从塔瓦科尼湖向拉姆湖的水转移所需的基础设施停止使用。 2007年10月1日之后,以防止进一步的用水限制和可能的用水量ing。所需的基础设施包括约30英里长的54和60英寸直径的传输管道以及两个泵站,每个泵站的原水泵送能力为75 MGD。估计项目成本为1亿元人民币。满足高度加速进度的关键路径问题包括整个项目团队的协调;路线选择;环境许可考虑因素;地役权和财产收购;电源;设备交付;同时建设多个项目组成部分。本文的重点是讨论关键路径问题,并提供从快速跟踪数百万美元输水工程的设计和施工中学到的经验教训。

著录项

  • 来源
  • 会议地点 Boston MA(US);Boston MA(US)
  • 作者单位

    Freese and Nichols, Inc., 1701 N. Market Street, Suite 500, LB 51, Dallas,rnTexas 75202, PH (214) 920-2500, FAX (214)-920-2265;

    Freese and Nichols, Inc., 1701 N. Market Street, Suite 500, LB 51, Dallas,rnTexas 75202, PH (214) 920-2500, FAX (214)-920-2265;

    Freese and Nichols, Inc., 1701 N. Market Street, Suite 500, LB 51, Dallas,rnTexas 75202, PH (214) 920-2500, FAX (214)-920-2265;

    Freese and Nichols, Inc., 1701 N. Market Street, Suite 500, LB 51, Dallas,rnTexas 75202, PH (214) 920-2500, FAX (214)-920-2265;

    North Texas Municipal Water District, 501 East Brown Street, Wylie, Texasrn75098, PH (972) 442-5405, FAX (972) 442-5405;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道输送;
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号