Lake Tawakoni Water Supply Project, Critical Path Issues and Lessons Learned: Fast-Tracking a USD100 million Water Transmission Project

机译:塔瓦肯尼湖供水项目,关键路径问题和经验教训:快速跟踪100万美元的水传输项目

获取原文

摘要

Since its formation in 1951, the North Texas Municipal Water District has been charged with developing a reliable water supply source for its 13 member cities and 46 other customers (some direct and some indirect), including more than 1.5 million people in portions of north Texas including portions of Collin, Dallas, Denton, and Kaufman Counties and all of Rockwall County. Recent long-range water supply planning efforts have identified significant increases in water demands that must be met through a corresponding increase in available raw water supply. Compounding the need for raw water is the fact that the North Texas region is currently in the second year of a drought that is the worst on record since the 1950s, with the District's primary water supply reservoir, Lake Lavon, falling some 17 feet in water surface elevation since mid-2005. In an effort to supplement available supplies, the District contracted for 50,000 acre-feet of water per year from the Sabine River Authority in Lake Tawakoni, located approximately 45 miles east of Dallas in October 2005. Given current drought conditions and ominous rainfall forecasts, the District has requested that the infrastructure needed to transfer this water from Lake Tawakoni to Lake Lavon be in service no later than October 1, 2007, to prevent further water restrictions and possible water rationing. The infrastructure needed includes approximately 30 miles of 54 and 60-inch-diameter transmission pipeline and two pump stations, each with a raw water pumping capacity of 75 MGD. The estimated project cost is USD100 million. Critical path issues for meeting the highly accelerated schedule include overall project team coordination; route selection; environmental permitting considerations; easement and property acquisition; power supply; equipment delivery; and construction of multiple project components simultaneously. The focus of this paper is to discuss the critical path issues and offer lessons learned from fast-tracking the design and construction of a multi-million dollar water transmission project.
机译:自1951年形成以来,北德克萨斯市政水区已被指控为其13个成员国和46名其他客户(一些直接和一些间接)开发可靠的供水来源,包括超过150万人的北德克萨斯州包括部分科林,达拉斯,丹顿和考夫曼县和所有摇滚墙县。最近的远程供水规划努力已经确定了需求的显着增加,必须通过相应的可用水供应量增加来满足。复合对原水的需求是北德克萨斯地区目前在一个干旱的第二年,这是自20世纪50年代以来最糟糕的记录,与该地区的主要供水水库,莱昂湖,落在水中约17英尺自2005年中期以来的表面高程。在努力补充可用的用品,该地区每年从塔瓦肯尼湖的Sabine River管理局签订50,000英亩的水,位于达拉斯以东大约45英里,于2005年10月位于达拉斯以东约45英里。鉴于当前干旱条件和不祥的降雨预测,该区已要求将该水从塔瓦肯尼湖转移到莱顿湖的基础设施,于2007年10月1日晚些时候,不得防止进一步的水限制和可能的水分配给。所需的基础设施包括大约30英里的54和60英寸直径的传输管道和两个泵站,每个泵站都有75 mgd的原水泵容量。估计的项目成本为1亿美元。满足高度加速时间表的关键路径问题包括整体项目团队协调;路线选择;环境允许考虑;地役权和财产收购;电源;设备交付;并同时构建多个项目组件。本文的重点是讨论关键路径问题,并提供从快速跟踪设计和建设的课程的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号