【24h】

Managing Changes to Engineering Products Through the Co-ordination of Human and Technical Activities

机译:通过人员和技术活动的协调来管理工程产品的变更

获取原文
获取原文并翻译 | 示例

摘要

Changes to engineering products need to be effectively co-ordinated with other members in the development team. Current approaches to managing change have limitations and often require further manual, ad-hoc activities to co-ordinate each change. This results in an inconsistent approach to change management. Our approach uses change processes to manage changes to products. Change processes are modelled using UML Activity Diagrams, which clearly show how human and technical activities are co-ordinated for each type of change operation. Change process enactment has been achieved in a research prototype by integrating workflow technology with a development system that supports versioning. This process-based approach to change management provides standardised, auditable change processes, which support change throughout the product development lifecycle. This negates the need for manual, ad-hoc activities to co-ordinate changes, resulting in a more consistent approach to managing change.
机译:工程产品的变更需要与开发团队中的其他成员有效地协调。当前管理变更的方法有局限性,并且通常需要进一步的手动临时活动来协调每个变更。这导致变更管理的方法不一致。我们的方法使用变更流程来管理产品变更。使用UML活动图对变更过程进行建模,该图清楚地显示了每种变更操作类型如何协调人力和技术活动。通过将工作流技术与支持版本控制的开发系统集成在一起,可以在研究原型中实现变更流程的制定。这种基于流程的变更管理方法提供了标准化的,可审核的变更流程,可在整个产品开发生命周期中支持变更。这样就无需进行手动的临时活动来协调变更,从而可以采用更一致的方法来管理变更。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号