This paper provides an overview of the design, fabrication and installation of Anadarko’s LuciusrnDevelopment flowlines, risers and topsides including all ancillary lifts required to fully complete therninstallation of the Lucius Spar.rnThe production flowlines, risers and associated structures were fabricated and installed by HeeremarnMarine Contractors US, Inc. utilizing the new build vessel DCV Aegir. At the time of contract executionrnthe vessel was still under development and new vessel procedures as well as project installationrnprocedures were required to perform the installation safely and within schedule. The export risers andrnflowlines were designed and fabricated by Technip USA, Inc. and installed using the Deep Blue reelrninstallation vessel. The export risers were pulled in utilizing a custom built 1,000-ton capacity chain jackrnsystem designed, fabricated and installed by Versabar, Inc., The topsides installation was performed byrnHeerema Marine Contractors US Inc. utilizing the heavy lift vessel DCV Thialf for the 10,000-tonrntopsides lift and the heavy lift vessel DCV Balder for the ancillary lifts.rnSome of the unique challenges addressed in this paper include some “firsts” which include the designrnand qualification of titanium stress joints on the export risers, the design and qualification of a diverlessrnclose in spool system as well as the design and qualification of a diverless pull head required to hang offrnthe export risers. This paper also addresses the design and offshore installation of a 1,000-ton chain jackrnsystem which was designed late in the project life to install the export risers after the main topsides wasrninstalled. Additional firsts included the use of pile based riser base pipeline end manifolds which wererndesigned to allow for a tight subsea architecture and sustain extensive bottom tension loads.
机译:本文概述了Anadarko的LuciusrnDevelopment流水线,立管和顶部的设计,制造和安装,包括完全完成Lucius Spar安装所需的所有辅助升降机。生产流水线,立管和相关结构由HeeremarnarnMarine Contractors美国制造和安装。 ,Inc.利用新型建造船DCV Aegir。在签订合同时,该船仍在开发中,需要新的船程序以及项目安装程序,才能安全且按计划进行安装。出口立管和出水管是由Technip USA,Inc.设计和制造的,并使用Deep Blue绕管安装容器进行安装。出口立管是利用Versabar,Inc.设计,制造和安装的定制的1000吨容量链式千斤顶系统拉进来的。顶部的安装由rnHeerema Marine Contractors US Inc.使用重型起重船DCV Thialf进行,用于10,000吨的顶部升降机和用于辅助升降机的重型起重船DCVBalder。rn本文所解决的一些独特挑战包括一些“第一”,包括出口立管上钛压力接头的设计和鉴定,阀芯上的无接头闭合装置的设计和鉴定。系统,以及悬挂出口立管所需的无潜水员拉头的设计和鉴定。本文还介绍了一个1000吨链条千斤顶系统的设计和海上安装,该系统在项目生命周期的后期设计,用于在安装了主要顶部之后安装出口立管。其他首创包括使用基于桩的立管底座管道末端歧管,其设计经过精心设计,可实现紧密的海底结构并承受较大的底部拉力载荷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号