Typhoon SeaStar TLP

机译:台风海星TLP

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the design, fabrication, installation andrnhook-up and commissioning of the Typhoon SeaStar.rnThe Typhoon SeaStar TLP was installed in 2097’ waterrndepth in Green Canyon 236/237 and produced First Oil onrnJuly 28th 2001, just eighteen months after project sanction. ThernAtlantia scope of project was completed on budget andrnon schedule.rnA reimbursable contract with a cost based managementrnfee proved to be effective in maintaining alignment betweenrnOwner and Contractor to minimize changes and avoid costrngrowth. Detailed planning and execution of onshore precommissioningrnwas key to achieving the very fast schedule.rnRepeat of a proven design with incentives to improve therndesign where possible was key to the successful outcome
机译:本文介绍了台风SeaStar的设计,制造,安装以及调试和调试。rn台风SeaStar TLP安装在2097英尺深的绿色峡谷236/237中,并于2001年7月28日生产了第一口石油,距项目批准仅18个月。项目的Atlantia范围已按预算和计划进度完成。具有成本管理的可偿还合同被证明有效地保持了业主和承包商之间的一致,以最大程度地减少变更并避免成本增长。陆上预调试的详细计划和执行是实现非常快的进度的关键。rn重复行之有效的设计并采取激励措施以改善设计,这是取得成功成果的关键

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号