The 5m-diameter driven anchor piles of Site U FPSO platform in 750m of water off Nigeria are currently thernlargest piles ever driven at a deepwater site. The use of driven piles was dictated by the soil conditions, withrndense sand units interbedded within soft clays and into which suction piles could not penetrate. In the samernarea, suction piles were used for the Site K FPSO in 1300m of water, thus allowing a relevant comparison ofrnthe two anchor pile options. For both cases, the paper provides a summary of the general site characteristicsrnand design methodology, together with comparison of the installation results to predictions.
展开▼
机译:Site U FPSO平台的5m直径锚固桩位于尼日利亚750m水深处,目前是有史以来在深水工地中最大的锚桩。打入桩的使用取决于土壤条件,密集的砂层夹在软粘土中,并且吸力桩无法穿透。在同一地区,Site K FPSO在1300m的水中使用了吸力桩,因此可以对两种锚固桩方案进行相关的比较。对于这两种情况,本文提供了一般场地特征和设计方法的摘要,以及安装结果与预测结果的比较。