Definition for technical success of iceberg towing operations

机译:冰山牵引作业技术成功的定义

获取原文

摘要

Offshore platforms proposed for operation in regions with icebergs must be designed to withstand ice loads associated with impacts for cases where icebergs cannot be managed or avoided. Both fixed and floating systems have been successfully used on the Grand Banks off Canada's east coast without incident to date. The Hibernia platform is designed to withstand impact loads; these loads were estimated without consideration of the efficiencies of ice management. The Terra Nova and White Rose FPSO's are designed to disconnect and move off site if threatening icebergs cannot be managed. These systems have ice strengthening, with the benefits of ice management considered in determining the design ice loads. Ice management efficiencies were based in large part on overall towing success rates determined from ice management records. Towing success was based on a number of criteria, including whether the iceberg was obviously deflected from its course and whether downtime resulted. It is expected that in the near future there will be pressures to reduce platform costs in order to make more marginal fields viable, platforms will be installed further north where iceberg and sea ice conditions are more severe and as more platforms come on stream, there will be restrictions regarding where icebergs can be safely towed so as not to increase risks to neighboring installations. As assessment of ice management becomes more critical, it will be desirable to develop more accurate measures of efficiency for assessing both downtime and potential for impacts. In this paper, a number of alternative methods for evaluating ice management efficiency with respect to impact avoidance and the potential influence on ice design loads are explored and criteria for further development of these discussed.
机译:提议在有冰山地区运行的海上平台必须设计成能够承受因冰山无法管理或避免的情况而产生的与冲击相关的冰负荷。迄今为止,固定系统和浮动系统均已成功用于加拿大东海岸以外的大银行。 Hibernia平台旨在承受冲击负荷;这些负荷的估算没有考虑冰管理的效率。如果无法处理威胁性的冰山,Terra Nova和White Rose FPSO旨在断开连接并移离现场。这些系统具有结冰功能,并在确定设计载冰量时考虑了结冰管理的好处。冰管理效率很大程度上取决于根据冰管理记录确定的总体牵引成功率。牵引成功取决于许多标准,包括冰山是否明显偏离航向以及是否导致停机。预计在不久的将来,将有降低平台成本的压力,以使更多的边际油田可行,平台将被安装在更北的冰山和海冰条件更为严峻的北部,并且随着更多平台的投产,限制在哪里可以安全地拖曳冰山,以免增加附近设施的风险。随着对冰管理的评估变得越来越关键,需要开发更准确的效率度量来评估停机时间和影响的可能性。在本文中,探讨了多种评估冰管理效率的方法,这些方法涉及避免影响以及对冰设计载荷的潜在影响,并讨论了进一步开发这些方法的标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号