首页> 外文会议>NASCODE V >Fuzzy systems application to electric short-term load forecasting. II. Computational results
【24h】

Fuzzy systems application to electric short-term load forecasting. II. Computational results

机译:模糊系统在电力短期负荷预测中的应用。二。计算结果

获取原文
获取原文并翻译 | 示例

摘要

For pt.I see ibid., p.125-30 (2003). In the first part of this paper, different fuzzy load models are developed for short-term load forecasting. The first model is a harmonic model with fuzzy coefficients. It is a function only of the hour in question, and it is suitable for summer and winter season. The second model is a hybrid model. It is a function of both the hour in question and the temperature at that hour and the previous hours. The coefficients of this model are fuzzy. Both models are implemented to predict the load of a large utility company. The obtained results show that when using such fuzzy models, the variations in the load power can be accounted for, since the estimated load power is within upper and lower limits.
机译:关于pt,我参见同上,第125-30页(2003)。在本文的第一部分中,针对短期负荷预测开发了不同的模糊负荷模型。第一个模型是具有模糊系数的谐波模型。它仅是所讨论的小时的功能,并且适合夏季和冬季。第二种模型是混合模型。它既是所讨论的小时数,又是该小时和前几个小时的温度的函数。该模型的系数是模糊的。两种模型都可以预测大型公用事业公司的负荷。所获得的结果表明,当使用这种模糊模型时,由于估计的负载功率在上下限内,因此可以考虑负载功率的变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号