首页> 外文会议>North American tunneling 2014 proceedings >Pushing the Limit—Shallow Cover Slurry TBM Mining Between Active Commuter Rail Tracks
【24h】

Pushing the Limit—Shallow Cover Slurry TBM Mining Between Active Commuter Rail Tracks

机译:推动极限—活跃通勤铁路轨道之间的浅层泥浆TBM采矿

获取原文
获取原文并翻译 | 示例

摘要

Slurry TBM evolution has allowed for increased control of face pressure and ground stabilityrnwhich correlates to increased success for shallow cover mining. This was a necessary component of the B/CrnTunnel Extension performed in Queens, NY for the East Side Access Project. Through a coordinated effort, therndesigner, contractor, and construction management teams pushed a 6.86m (22'-6") diameter Herrenknecht slurryrnTBM beyond contract expectations, culminating in less than ½ shield diameter of cover. This paper exploresrnthe operation strategy with details regarding the surface and underground coordination, instrumentation plan,rnand program wide cost and schedule savings associated with its success.
机译:泥浆TBM的发展已使对工作面压力和地面稳定性的控制得以增强,这与浅表层开采的成功率增加相关。这是在纽约皇后区为East Side Access项目进行的B / CrnTunnel扩展的必要组成部分。通过协调的努力,设计人员,承包商和施工管理团队将直径为6.86m(22'-6“)的海瑞克浆TBM超出了合同的预期,最终使覆盖层的护罩直径小于½。本文探讨了操作策略,并详细介绍了地面和地下协调,仪器仪表计划,与计划相关的广泛成本以及与计划成功相关的时间表节省。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号