Use of Ground Freezing for Connecting Two Tunnel Boring Machine- Driven Tunnels 300 Feet Underground

机译:使用地面冻结来连接两个隧道掘进机驱动的地下隧道300英尺

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

With half of the 6,100-m- (20,000-ft)-long Brightwater Conveyance System Tunnel 3 completedrnin glacial and non-glacial deposits, cutterhead damage to the tunnel boring machine (TBM) was detected thatrnled to it being abandoned. The TBM position—about 100 m (300 ft) underground with more than 5 bar ofrnhydrostatic pressure—meant it was not possible to access it from the ground surface. A plan was developedrnand successfully implemented to complete the remaining tunnel section with a smaller-diameter TBM miningrnfrom the opposite direction into the disabled, larger-diameter TBM shield. At the connection point, the groundrnwas frozen around the disabled TBM using freeze pipes drilled from the ground surface, supplemented byrnfreeze pipes drilled from inside the TBM. This freezing stabilized the soils at the tunnel face and cut offrngroundwater, which allowed workers to access the cutterhead under atmospheric conditions, dismantle thernTBM and completely empty the shield. This paper describes the design considerations and implementation ofrnground freezing work, TBM docking operations and construction of the tunnel connection.
机译:在6,100米(20,000英尺)长的Brightwater输送系统3号隧道中,一半冰川和非冰川沉积物完工后,发现钻头损坏了隧道掘进机(TBM),并被废弃了。 TBM位置-地下约100 m(300 ft),静水压超过5 bar-意味着不可能从地面接近它。制定并成功实施了一个计划,以从相反方向进入较小的大直径TBM盾构的小直径TBM采矿来完成剩余的隧道段。在连接点,使用从地面钻出的防冻管,再加上从TBM内部钻出的防冻管,将地面冻结在禁用的TBM周围。这种冻结作用使隧道工作面的土壤稳定并切断了地下水,这使工作人员可以在大气条件下进入割刀头,拆除TBM并完全清空防护罩。本文介绍了地下冻结工作,TBM对接操作和隧道连接施工的设计注意事项和实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号