首页> 外文会议>North American Tunneling 2000, Jun 6-11, 2000, Boston, Massachusetts >Use of contract unit prices for fair and reasonable payment of changes in baseline quantities for tunnel construction
【24h】

Use of contract unit prices for fair and reasonable payment of changes in baseline quantities for tunnel construction

机译:使用合同单价公平合理地支付隧道施工基准量的变化

获取原文
获取原文并翻译 | 示例

摘要

We seem to have evolved into a situation where changed conditions is at the nexus of any and all claim situations in tunnel construction. The writer would like to postulate that there is no such thing as a changed condition for an entire contract, but rather every contract has varying conditions within the contract limits, especially for longer tunnels. Proceeding from the above postulate, it follows that there must be a full articulation and interdependency between: 1. The Geotechnical Report Baseline (GBR) and the .... 2. Measurement and Payment sections of the Specifications and the .... 3. General Specifications, especially the variable quantity clause(s) and the .... 4. Plans and the .... 5. Bid Schedule which will set appropriate lump sums (including the GBR quantities) or GBR quantities with bid unit prices. All changes from the GBR quantities will be paid for as directed (by the owner or his authorized representative) additional work at the directed additional work bid unit prices with stipulated minimum unit prices in the Bid Schedule. The bid directed additional unit price and bid quantities will be used for purposes of bid comparison only! Note that the stipulated minimum unit prices will prevent bid unbalancing by the Contractor and assure inclusion of money in the bid for additional payment, if owner directed additional work for changes in the GBR quantities is necessary. Also, note that directed additional unit price work may not be a function of only quantities, but time, as well. Some specific examples are cited below: 1. grouting - if at the face ( paid as owner directed delay, i.e. per crew and/or rig hour or shift plus unit price for volume injected); if from surface (paid for volume injected) 2. boulders - to be paid for as owner directed delay, i.e. per crew and/or rig hour or shift basis.
机译:我们似乎已经演变成这样一种情况,即条件变化是隧道施工中所有索赔情况的关键。作者想假设,整个合同不存在条件改变的情况,而是每个合同在合同限制之内都有变化的条件,特别是对于较长的隧道。从上述假设出发,可以得出以下结论:1.岩土工程报告基准(GBR)与.... 2.规范的测量和付款部分以及.... 3之间必须有充分的联系和相互依存。 。一般规格,特别是可变数量条款和.... 4.计划和.... 5.投标时间表,它将设置适当的总价(包括GBR数量)或带有投标单位价格的GBR数量。 GBR数量的所有更改将按照(由业主或其授权代表)指示的额外工作,按照指示的额外工作投标单价(在投标明细表中指定最低单位价格)进行。出价指示的附加单价和出价数量仅用于出价比较!请注意,如果业主需要为GBR数量的更改进行额外的工作,则规定的最低单价将防止承包商的投标不平衡,并确保在投标中包含更多的款项。另外,请注意,定向附加单价工作可能不仅取决于数量,而且取决于时间。以下是一些具体示例:1.注浆-如果在现场(按所有者指示的延误支付,即按船员和/或钻机小时数或轮班加注单价的单价);如果是从地面来的(为注入的体积付费)2.巨石-根据船东指示的延误付费,即按船员和/或钻机小时数或班次付费。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号