An organized, sustained level of public participation through environmental review, design and construction of MWRA's MetroWest Water Supply Tunnel Project

机译:通过对MWRA的MetroWest供水隧道项目进行环境审查,设计和建设,使公众有组织地,持续地参与

获取原文
获取原文并翻译 | 示例

摘要

The Massachusetts Water Resources Authority (MWRA), like many water suppliers across the country has embarked on several major infrastructure improvement programs to take an essentially 19th century, regional water system and bring it into the 21st century. The need to build a new water treatment plant, construct an 18 mile deep-rock water transmission line as well as prepare for the removal of open distribution reservoirs provided a significant challenge in highly developed suburban Boston. The focus of this paper is to detail how the MWRA organized, supported and incorporated citizen participation to build an alliance of stakeholders during the environmental review, design and construction phases of the MetroWest Water Supply Tunnel Project.
机译:与马萨诸塞州的许多水供应商一样,马萨诸塞州水资源管理局(MWRA)已着手进行了几项主要的基础设施改善计划,以期从本质上讲是19世纪的区域供水系统,并将其带入21世纪。在高度发达的波士顿郊区,建造新的水处理厂,修建一条18英里深的岩石输水线以及为拆除露天分配水库做准备的需求,这是一个巨大的挑战。本文的重点是详细说明MWRA在MetroWest供水隧道项目的环境审查,设计和施工阶段如何组织,支持和吸收公民参与,以建立利益相关者联盟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号