首页> 外文会议>North American Society for Trenchless Technology (NASTT) no-dig show >HDD Bundled Water and Sewer Pipelines Beneath the Napa River: Facilitating Build-out in the Northern California Wine Country
【24h】

HDD Bundled Water and Sewer Pipelines Beneath the Napa River: Facilitating Build-out in the Northern California Wine Country

机译:纳帕河下方的HDD将水和污水管道捆绑在一起:促进北加州葡萄酒之乡的建设

获取原文
获取原文并翻译 | 示例

摘要

Stanly Ranch is located a half-mile west of the Napa Sanitation District’s Soscol Water Treatment and RecyclingrnFacility in the Northern California wine country near Napa. Despite its close proximity, the ranch has no sanitaryrnsewer and recycled water conveyance pipelines to and from the facility. Between the ranch and the facility are railroadrntracks, an extrapolation of the West Napa fault, the Napa River and broad wetlands. Plans for the ranch include a fivestarrnSt. Regis resort. Resort development requires providing sanitary sewer and irrigation water services to the ranchrnfrom across the Napa River. Geotechnical findings led to the horizontal directionally drilled (HDD) design andrnconstruction of an 8-inch-diameter (205 mm) sanitary sewer force main and a 24-inch-diameter (610 mm) recycledrnwater pipeline (both of high density polyethylene) between the ranch and the facility. The pipelines were bundled andrninstalled together in one 2,300-foot-long (701 m) continuous HDD reach. Key geotechnical findings that led to thernselection of HDD as the preferred trenchless method of installation are illustrated. The HDD design is summarized,rnincluding estimates of pipe stress during pull-back and hydrofracture risk. Details and events of the actual HDDrnconstruction are compared with design estimates.
机译:Stanly Ranch位于北加州葡萄酒之乡纳帕附近的纳帕卫生区的Soscol水处理和回收设施以西半英里处。尽管牧场近在咫尺,却没有到工厂的下水道和循环水输送管道。在牧场和设施之间是铁轨,西纳帕断层,纳帕河和广阔的湿地的外推。牧场的计划包括一个五星级的圣。里吉斯度假胜地。度假村的开发需要从纳帕河对岸的牧场提供卫生的下水道和灌溉用水服务。岩土工程发现导致水平定向钻井(HDD)设计,并在管道之间形成了一条8英寸直径(205 mm)的下水道主管和一条24英寸直径(610 mm)的循环水管道(均为高密度聚乙烯)。牧场和设施。将管道捆扎在一起并安装在一个2,300英尺长(701 m)的连续HDD范围内。说明了导致选择HDD作为首选的非开挖安装方法的主要岩土工程发现。对HDD设计进行了总结,包括对拉回和水力压裂风险期间管道应力的估计。将实际HDDrnconstruction的详细信息和事件与设计估计值进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号