Trenchless Approaches to Overcome Difficult Ground Conditions in Downtown San Francisco

机译:无沟渠的方法来克服旧金山市区的困难地面条件

获取原文
获取原文并翻译 | 示例

摘要

The potential for existing improvements and obstructions adversely impacting construction is present in nearly allrnunderground projects. This risk is escalated for projects that are undertaken in densely populated urban settings wherernextensive changes in land use and subsequent development and land reclamation have significantly altered conditionsrnbeneath the surface. Such circumstances prompted some of the more significant challenges faced by the project teamrnduring construction of the San Francisco Public Utilities Commission’s North Shore to Channel Force Main.rnLocated within downtown San Francisco, the force main alignment traverses numerous older facilities that werernabandoned and buried in-place during reclamation and development of the San Francisco Bay. Potential obstructionsrnassociated with these facilities, coupled with challenging geotechnical conditions and numerous nearby active utilities,rnposed significant project challenges. Much of the force main alignment was planned as open-cut with trenchlessrnmethods incorporated at certain locations to minimize impacts to traffic, neighboring businesses and facilities, andrnexisting utilities. While a number of methods were considered for the trenchless installations, pilot tube probes werernused to locate obstructions; and pilot tube guided pipe ramming and auger boring, and open-face pipe jacking werernused to complete the force main construction.rnThis paper provides an overview of the trenchless methods used for the project and discusses the trenchless approachrndeveloped during design, challenges associated with obstructions, modifications to the trenchless approach madernduring construction, and lessons learned.
机译:在几乎所有地下工程中都存在可能对建筑造成不利影响的现有改进和障碍物。对于在人口稠密的城市环境中进行的项目,这种风险会加剧,在这些环境中,土地使用的广泛变化以及随后的开发和土地开垦已大大改变了地表以下的条件。这种情况引发了项目团队在旧金山公用事业委员会北岸至海峡主力部队的建设过程中面临的一些更为重大的挑战。位于旧金山市中心的部队主力纵队穿越了许多被废弃并埋在原地的旧设施。在旧金山湾的填海和开发中。与这些设施相关的潜在障碍,加上充满挑战的岩土条件和附近众多的公用事业设施,给项目带来了巨大挑战。计划将大部分部队主线调整为明挖,并在某些位置采用了非开挖方法,以最大程度地减少对交通,邻近企业和设施以及现有公用事业的影响。尽管考虑了多种方法来进行非开挖式安装,但还是使用了先导管探头来定位障碍物。并使用了先导管捣打和螺旋钻钻孔,以及裸露的顶管来完成主力施工。本文概述了该项目使用的非开挖方法,并讨论了设计期间开发的非开挖方法,与障碍相关的挑战,在施工过程中对非开挖方法进行了修改,并吸取了教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号