The Hillsborough County Florida State Road 674 (SR 674) Force Main, Phase II project is part of a multi-phasernproject which will extend a new force main from central Hillsborough County to the South County WastewaterrnTreatment Plant. In April, 2010 Cardno TBE was retained to provide final route selection, design, permitting, bidrnassistance and construction phase services. The project includes approximately 11,000 linear feet of 30-inchrndiameter force main and the crossings of SR 674 and Interstate 75 (I-75).rnTrenchless construction methods considered and evaluated for the two major Florida Department of Transportationrn(FDOT) crossings included horizontal auger boring and pipe jacking, horizontal directional drilling andrnmicrotunneling. In general, the geotechnical investigation conducted at these crossings indicated fine to mediumrnsandy soils and the presence of a relatively shallow groundwater table. In addition, there was evidence of arnsignificant downward gradient between the surficial water table and the deeper piezometric level within the upperrnFloridan aquifer.rnMicrotunnel was ultimately selected as the preferred method for constructing the FDOT crossings. A number ofrnprecautions were implemented to insure a successful project. The project presents several intriguing challenges,rnmost notably the selection of the trenchless construction method and the logistics of the proposed tunnelingrnoperations.rnThis paper discusses several issues in selecting an appropriate trenchless method unique to a successful microtunnelrnoperation under heavily traveled roadways. Specific issues addressed during the planning, design, bidding andrnconstruction phases of this project will also be discussed.
机译:希尔斯伯勒县佛罗里达州州际公路674号(SR 674)二期工程是多阶段工程的一部分,该工程将把新的总管从希尔斯伯勒县中部延伸至南县污水处理厂。 2010年4月,Cardno TBE被保留,以提供最终路线选择,设计,许可,投标协助和施工阶段服务。该项目包括约11,000线性英尺的30英寸直径的主力管以及SR 674和75号州际公路(I-75)的交叉口。rn为佛罗里达州的两个主要运输部门考虑和评估的无节流施工方法rn包括水平螺旋钻和顶管,水平定向钻井和微型隧道。通常,在这些过境点进行的岩土工程研究表明,土壤为中度到中度沙土,并且地下水位相对较浅。此外,有证据表明,在弗洛里丹蓄水层上部的表层地下水位和深测压水位之间存在明显的向下梯度。最终选择了微隧道作为构造FDOT穿越的首选方法。为确保项目成功实施了许多预防措施。该项目提出了许多有趣的挑战,其中最值得注意的是选择非开挖施工方法和拟议的隧道作业的后勤工作。本文讨论了在成功地进行大量隧道作业的情况下,选择成功进行微隧道作业所必需的合适非开挖方法的几个问题。还将讨论在该项目的规划,设计,招标和施工阶段解决的特定问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号