HDD Challenge: Pipeline River and Levee Crossing Combines Trenchless and Over-the-Top Construction Methods

机译:硬盘挑战:管线河和堤岸穿越相结合的非开挖和超顶施工方法

获取原文
获取原文并翻译 | 示例
       

摘要

Considering trenchless design engineering alternatives early during project routing can offer considerable savings of time and money for pipeline owners.The combination of over-the-top levee crossings with an HDD installation from bat-ture to batture under the river allows for a shorter HDD length, the ability to use smaller equipment in construction, and less permitting and review due to the lesser risk to levee foundation soils. Pipeline owners should consider the shortest or most direct route might not always be the easiest way to cross an obstacle. Looking upstream and downstream for ample space between the river and levee for HDD entry and exit points, and routes could be adapted to accommodate these types of crossings where appropriate.
机译:在项目布线过程中尽早考虑采用非开挖设计工程替代方案可以为管道所有者节省大量时间和金钱。跨河堤坝与从河底到底盘的HDD安装相结合,可以缩短HDD长度,能够在建筑中使用较小的设备,并且由于对堤坝基础土壤的风险较小,因此许可和审查的能力也较低。管道所有者应考虑最短或最直接的路线可能并不总是越过障碍的最简单方法。在上游和下游寻找河流和堤坝之间的足够空间,以供硬盘驱动器进入和退出点使用,并且可以在适当的情况下调整路线以适应这些过境点。

著录项

  • 来源
    《Trenchless Technology》 |2016年第3期|66-68|共3页
  • 作者

    James Vincent;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 02:09:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号