首页> 外文会议>Modern rockfill dams-2009 >Analysis of Settlement Deformation of Wuluwati Concrete Face Rockfill Dam
【24h】

Analysis of Settlement Deformation of Wuluwati Concrete Face Rockfill Dam

机译:乌鲁瓦提混凝土面板堆石坝沉降变形分析

获取原文
获取原文并翻译 | 示例

摘要

Wuluwati CFRD has been running in a high water level for 8 years by the end of 2008 and complete monitoring data has been gotten since construction.Based on safety monitoring data in recent 10 years,the rheological analysis model of settlement decrement with time was established in this paper according to settlement influence factors (such as water and deadweight)and stress-strain elastic-plastic characteristics of rockfill material.Via the comparison of different final settlement formula with Wuluwati monitoring data,the time curve fitting method was proved to be better. The multivariate statistical model is good at analyzing the settlement influenced by load.Combination of these two methods will help to understand the CFRD material characteristics changing with time comprehensive-ly.
机译:乌鲁瓦提CFRD到2008年底已在高水位运行了8年,自施工以来已获得了完整的监测数据。基于近10年的安全监测数据,建立了随时间变化的沉降量流变分析模型。结合堆石料的沉降影响因素(水,载重等)和应力应变弹塑性特征,通过将不同最终沉降公式与乌鲁瓦提监测数据进行比较,证明时间曲线拟合方法较好。多元统计模型擅长分析受荷载影响的沉降。将这两种方法结合起来,将有助于全面了解CFRD材料随时间变化的特性。

著录项

  • 来源
    《Modern rockfill dams-2009》|2009年|p.719-724|共6页
  • 会议地点 Chengdu(CN)
  • 作者单位

    Xinjing Institute of Water Resources and Hydropoiuer Research,Urumqi 830049,China;

    Xinjing Institute of Water Resources and Hydropoiuer Research,Urumqi 830049,China;

    Xinjing Institute of Water Resources and Hydropoiuer Research,Urumqi 830049,China;

    Xinjing Institute of Water Resources and Hydropoiuer Research,Urumqi 830049,China;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 挡水坝;
  • 关键词

    settlement; statistics analysis; final settlement;

    机译:结算;统计分析;最终结算;
  • 入库时间 2022-08-26 14:06:23

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号