首页> 外文会议>Modeling and simulation for defense systems and applications VI >Applying risk-based MS VVA techniques to test and laboratory facilities
【24h】

Applying risk-based MS VVA techniques to test and laboratory facilities

机译:将基于风险的M&S VV&A技术应用于测试和实验室设施

获取原文
获取原文并翻译 | 示例

摘要

The Department of Defense (DOD) is exercising a risk-based process for verifying, validating and accrediting models and simulations (M&S) used in system acquisition. Test and laboratory facilities can potentially have even greater potential negative consequences to a program than M&S if there are errors present in the test and analysis results, since test results are usually considered closer to the "truth" than M&S results. This paper will discuss how the risk-based M&S verification, validation and accreditation (VV&A) process is being applied to test and laboratory facilities, issues associated with this different application of the process, and thoughts on the broader applicability of risk-based VV&A beyond the current application
机译:国防部(DOD)正在执行基于风险的流程,以验证,确认和认证用于系统采购的模型和仿真(M&S)。如果测试和分析结果中存在错误,则测试和实验室设施对程序的潜在负面影响甚至可能比M&S大,因为通常认为测试结果比M&S结果更接近“真相”。本文将讨论基于风险的M&S验证,确认和认证(VV&A)过程如何应用于测试和实验室设施,与该过程的不同应用相关的问题以及对基于风险的V&A的更广泛适用性的思考当前的应用

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号