When a signaling system reaches its end of life, an overall replacement is necessary. The replacement may be in-kind but for many mass transit agencies, it is common that capacity needs will have grown significantly, and the transit agency is required to increase capacity while tackling obsolescence. Capacity and obsolescence are the primary reasons for deploying Communications Based Train Control (CBTC) technology to replace conventional trip stop and track circuit-based systems operated by New York City Transit (NYCT) or cab signaling systems operated by Baltimore Maryland Transit Administration (MTA) and the San Francisco Bay Area Rapid Transit District (BART). Resignaling projects are often refereed as brownfield train control projects. Due to the technical and commercial complexity, the quantity of stakeholders, the number of interfaces, the regulatory involvement via safety certification, the temporal and geographic scale of the project and the continual evolution of the existing system, a robust Systems Engineering (SE) process is necessary to achieve success in large signaling replacement projects. This paper describes the software tools and processes that were deployed to meet the technical, legal and commercial needs of a large signaling replacement project during the specification development phase. The processes put in place were tailored to the size and location of the team members. The paper describes the software tools, such as IBM Rational DOORS, Microsoft SharePoint Online and Office 365 which were integrated and configured to allow for collaboration while accounting for the security, commercial and legal requirements of the agency. The selection, deployment and management of these processes and tools enabled the large, complex project to succeed.
机译:当信号系统达到其生命结束时,必须进行整体更换。更换可能是实物的,但对于许多批量转抵机构来说,常见的需求普遍存在的需求将会显着增加,并且在处理过时时需要运输机构增加能力。能力和过时是部署基于通信的列车控制(CBTC)技术的主要原因,以取代纽约市际运输(NYCT)或由Baltimore Maryland Transit Prominial(MTA)操作的纽约市际运输(NYCT)或CAB信号系统操作的轨道电路的系统和旧金山湾区迅速过境区(巴特)。重新登记项目通常被归因为Brownfield Train控制项目。由于技术和商业复杂性,利益相关者的数量,界面的数量,通过安全认证的监管参与,项目的时间和地理规模和现有系统的持续演变,强大的系统工程(SE)过程在大信中更换项目中取得成功是必要的。本文介绍了在规范开发阶段期间部署的软件工具和流程,以满足大型信令更换项目的技术,法律和商业需求。到位的过程是针对团队成员的大小和位置量身定制的。本文介绍了软件工具,如IBM Rational Doors,Microsoft SharePoint Online和Office 365,它们集成并配置为允许合作,同时占原子能机构的安全,商业和法律要求。这些进程和工具的选择,部署和管理使能够成功的大型复杂项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号