首页> 外文会议>International Conference on Conceptual Structures >Lifted Temporal Most Probable Explanation
【24h】

Lifted Temporal Most Probable Explanation

机译:举起时间最可能的解释

获取原文

摘要

The lifted dynamic junction tree algorithm (LDJT) answers filtering and prediction queries efficiently for temporal probabilistic relational models by building and then reusing a first-order cluster representation of a knowledge base for multiple queries and time steps. Another type of query asks for a most probable explanation (MPE) for given events. Specifically, this paper contributes (i) LDJT~(mpe) to efficiently solve the temporal MPE problem for temporal probabilistic relational models and (ii) a combination of LDJT and LDJT~(mpe) to efficiently answer assignment queries for a given number of time steps.
机译:提升的动态结树算法(LDJT)通过建筑物为时间概率关系模型有效地回答过滤和预测查询,然后重用用于多级查询和时间步骤的知识库的一阶群集表示。另一种类型的查询要求给定事件的最可能的解释(MPE)。具体而言,本文有助于(i)LDJT〜(MPE),以有效地解决时间概率关系模型的时间MPE问题,并且(ii)LDJT和LDJT〜(MPE)的组合,以有效地应答给定的时间数量的分配查询脚步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号