首页> 外文会议>ASSE Professional Development Conference >New Solutions to Equipment Facilities Installation Safety Risks Using Integrated Hazard Analysis
【24h】

New Solutions to Equipment Facilities Installation Safety Risks Using Integrated Hazard Analysis

机译:设备与设施的新解决方案使用综合危害分析安全风险

获取原文

摘要

Addressing and managing risk to a company can be approached reactively or proactively. In a proactive approach, addressing and managing business risk is integrated with equipment or facilities hazard analysis and sign-off protocol to further highlight Environmental, Health, and Safety (EHS) issues in advance of installations and construction. This approach leads to lower risk, decreased costs, a more consistent approach across developing and existing installations and facilities, and a safer workforce. This paper provides an overview of how and why to use this integrated hazard analysis process in each phase from design through startup. Finally, we'll look ahead to an emerging trend in supply chain - robotics, and specifically, collaborative robots, or "CoBots" - with a view to applying the integrated hazard analysis to minimize cost and risk in the integrated work environment.
机译:可以反应地或积极地接近对公司的解决和管理风险。在主动的方法中,解决和管理业务风险与设备或设施危害分析和签收协议集成,以进一步突出环境,健康和安全(EHS)的安装和施工。这种方法导致风险降低,成本降低,开发和现有装置和设施的更一致的方法以及更安全的员工。本文概述了如何以及为什么在通过启动设计的每个阶段使用此集成危险分析过程。最后,我们将展望供应链的新兴趋势 - 机器人,具体地,协作机器人或“Cobots” - 以应用综合危险分析来最小化综合工作环境中的成本和风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号