首页> 外文会议>SPE Asia Pacific Oil Gas Conference and Exhibition >Best Practice for Cementing and Zonal Isolation Using the Jet-TypePerforate, Wash and Cement Technique
【24h】

Best Practice for Cementing and Zonal Isolation Using the Jet-TypePerforate, Wash and Cement Technique

机译:采用喷射键体,洗涤和水泥技术的粘合和带状隔离的最佳实践

获取原文

摘要

In 2014 ConocoPhillips (CoP) decided to focus on the Jet-type perforate, wash and cement (P/W/C)technique as its primary permanent well abandonment method for setting a full cross-sectional cement/steelbarrier. Following this decision, a quality improvement project was launched to prepare for a transitionfrom Cup-type to Jet-type P/W/C to improve barrier plug quality. The initiative was presented during theStavanger P&A Forum (PAF) conference October 2014 for information and to indicate for specific vendorsthat there were opportunities for participation. The perforate, wash and cement method is complex and as with any cementing operation there isoperational risk involved. This paper is written to share ConocoPhillips experience and learning from theimprovement project which is still ongoing. It is specifically written for drilling engineers planning Jet-typeP/W/C operation to help identifying key parameters to achieve a top-quality operation as well as managingthe operational risk inherent to the operation. Quality requirement in P&A operations? It can be a hard sell to argue for costly fluids, BHAs (bottomhole assembly) and TCP (tubing conveyed perforation) guns to plug off a depleted reservoir where the testof time is hundreds of years from now as the reservoir gets pressurized again. The latter is not the case in theGreater Ekofisk Area (GEA) where active water injection increases the average reservoir pressure quicklyand the established production strategy is dependent on good isolation of abandoned wellbores. To get a ‘’good’’ P&A plug you need to understand how to prioritize and control the variables such ascement properties, drilling fluid properties, drill pipe and BHA design, hole cleaning, ECD, displacement,TCP performance, operational sequence and many more. ConocoPhillips have made a structured approachto build a process which captures the basics of getting a high quality well abandonment plug. Thedisplacement process itself has been modelled with computational fluids dynamics (CFD) software tounderstand key drivers for the placement of a cross-sectional P&A plug.
机译:2014年,康菲石油(COP)决定专注于喷射式穿孔,洗涤和水泥(P / W / C)技术,作为其主要的永久性井放弃方法,用于设置全横截面水泥/钢载体。在此决定之后,启动了质量改进项目以准备过渡杯式,以提高P / W / C,以提高屏障插头质量。该倡议是在2014年10月10月10月的博斯塔夫兰德对论坛(PAF)大会期间提供的,并表明具体的vendorsthat有机会参加。穿孔,洗涤和水泥法复杂,与任何粘合操作一样,涉及的任何粘合操作。本文是为了分享康菲利普斯的经验和学习仍在持续的过程中。它专门为钻探工程师规划喷气式机/ W / C操作编写,以帮助识别关键参数以实现最高质量的操作,并管理操作所固有的操作风险。 P&A业务的质量要求?它可以是一个坚硬的销售,以争论昂贵的流体,BHAS(底座组件)和TCP(管道输送的穿孔)枪撤销耗尽耗尽的水库,在那里,随着水库再次加压,距离时间数百年的时间数百年。后者不是在地区的EKOFISK区域(GEA)中的情况,其中有源注水增加了平均储层压力,雄厚的成熟的生产策略依赖于良好的被废弃的井筒隔离。要获得“良好”的P&A插头,您需要了解如何优先顺序和控制变量,这种升高属性,钻井液性能,钻杆和BHA设计,孔清洁,ECD,位移,TCP性能,运营序列等等。 Conocophillips已经制作了一个结构化的方法,构建了一个捕获获得高质量放弃插头的基础的过程。本身已经用计算流体动力学(CFD)软件Toundstand键驱动器进行了建模,用于放置横截面P&A插头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号