The Risk Management Decision Model of the Construction Project Duration and Adaptive Genetic Algorithm

机译:建设项目持续时间和自适应遗传算法的风险管理决策模型

获取原文

摘要

The scientific technology of decision-making can be used in the choice of construct plan and make sure of the cost, quantity and schedule. But in the process of carry it out, the change of design; the problem of material supply, the variety of natural condition etc are ineluctable. They make the actual plan is not accord with the optimum plan in te case of recreate of some working procedure or indetermination duration of some constructions section. According to the characteristics of the process of the construction project, the risk management decision model of the construction project is presented. Some essential risk factors of the project duration such as activity overlapping, activity iterations, uncertain activity durations and non-consumable resource amount are integrated into the decision model. There are some random variables in the model and the relationship of input and output variables only can be got after the simulation. Considering the characteristics of the model, a simulation optimization method based on adaptive genetic algorithm is proposed. A case study shows that the algorithm is beneficial.
机译:决策技术可用于选择建设计划并确保成本,数量和时间表。但在携带它的过程中,设计的变化;物料供应问题,各种自然条件等都是不可用的。他们使实际计划不符合TE案例的最佳计划,以重建一些工作程序或某些建筑部分的不确定持续时间。根据建设项目的过程的特点,提出了建设项目的风险管理决策模型。项目持续时间的一些基本风险因素如活动重叠,活动迭代,不确定活动持续时间和不可消耗资源量等于决策模型。模型中有一些随机变量,输入和输出变量的关系只能在模拟后得到。考虑到模型的特征,提出了一种基于自适应遗传算法的仿真优化方法。案例研究表明该算法是有益的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号