Operating and Maintaining Median High Tension Cable Barrier on Highway 2 in Alberta

机译:在Alberta的高速公路2中经营和维护中位数高压电缆屏障

获取原文

摘要

Alberta Transportation has been a leader in the application of High Tension Cable Barrier (HTCB) as a median barrier. In 2010, construction of 133 km of HTCB in the median of Highway 2 was completed from North of Airdrie to Red Deer and near Leduc. The design of this HTCB was complex due to the variety of median conditions when considering variables such as median width, sideslopes, and existing hardware in the median. Recent inquiries with HTCB suppliers indicate that this project remains the largest single HTCB installation in North America to date. Previous papers in TAC proceedings by staff of EBA, A tetra Tech Company, have discussed the design, construction and safety performance of this HTCB project. This paper will present a comprehensive discussion of the various maintenance and operational issues and considerations for this HTCB installation. The maintenance and operations of the HTCB has included repairs following hits (replacement of posts and attachments, cable sections, turnbuckles, etc.), regular maintenance, and changes to mowing and snow clearing practices. Although repairs to the HTCB can be completed faster than steel beam barriers, traffic accommodation to ensure the safety of workers and the traveling public is of paramount concern on Highway 2. Another issue which has resulted in the need for repairs of the HTCB is the cutting of the cable by first responders to free vehicles caught in the HTCB. Cutting of the cable can be hazardous due to the high tension in the system and results in a need to splice the cable or replace a significant length of cable at a high cost relative to alternative methods of releasing tension in the system. To reduce the frequency of this occurrence and to minimize risk to first responders (firemen, police, and tow-truck operators), EBA provided training sessions in Leduc, Red Deer and Calgary. The content of, participation in and results of this training program will be discussed. Following the first year of operations a warranty inspection was completed and the observations and repair requirements are presented. Lessons learned from the review of these topics will be of use to road agencies that are proceeding with the use of this flexible barrier system that has proven to be effective in reducing the severity of cross median collisions in Alberta and elsewhere.
机译:Alberta运输一直是应用高张力电缆屏障(HTCB)作为中位屏障的领导者。 2010年,在2号高速公路2号高速公路中位于Airdrie的北部完成了133公里的HTCB,到了Red Deer和Leduc附近。由于在考虑中位数中位数,侧面,侧面和现有硬件等变量时,这种HTCB的设计是复杂的。 HTCB供应商的最近查询表明,该项目迄今为止仍然是北美最大的单一HTCB安装。前者在TAC EBA员工员工讨论了TETRA TECH公司,讨论了这个HTCB项目的设计,建设和安全性能。本文将全面讨论此HTCB安装的各种维护和操作问题和考虑因素。 HTCB的维护和运营包括击中(更换帖子和附件,电缆部分,螺丝扣等),定期维护和割草和雪清除实践的修复。虽然对HTCB的维修可以比钢梁屏障,交通住宿更快地完成,但是为了确保工人的安全和旅行公众在高速公路上至关重要。另一个问题导致了HTCB维修的需要是切割第一个响应者的电缆到捕获在HTCB中的免费车辆。由于系统中的高张力,并且需要在电缆中接头或者以高成本相对于释放系统中的伸张张力的替代方法来替换电缆或更换大量电缆的结果,因此切割电缆可能是危险的。为了减少这种发生的频率,并尽量减少对第一响应者的风险(消防员,警察和拖车运营商),EBA在Leduc,Red Deer和Calgary提供了培训课程。将讨论此培训计划的内容,参与和结果。在运营的第一年后,完成了保修检查,并提出了意见和修复要求。从这些主题的审查中汲取的经验教训将对正在使用这种灵活的屏障系统进行的道路机构,该系统已被证明可以有效地减少艾伯塔省和其他地方的交叉中位碰撞的严重程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号